Back to the decking

Tuesday, April 12: While the wood-filler was drying on the kitchen oven project, it was back to work on the upstairs room.


Half-sheet of plywood installed. Once the piece to the left goes down, the bridge will effectively no longer be a bridge.

I'm not trying to do product placement. The point of this photo is that I got fed up with constantly reloading the normal-caulk-size tubes of glue, so I went and bought this huge contractor's caulk gun. One tube contains about three times the amount of a normal caulk tube  –  but at the cost of only about 2 small tubes.  Of course, with this big gun I'll probably overdo it and use more glue than I need.
The full sheet leaning against the wall will be the next to go down.
I cut a narrow little jigsaw piece to fill in a slight gap where the new plywood meets the old.